El desplazamiento intraurbano por obras públicas en la ciudad de Medellín:

caso Metrocable del Picacho

Authors

  • Valeria Rincón Zapata Universidad Autónoma Latinoamericana

DOI:

https://doi.org/10.24142/cose.n5a6

Keywords:

Resettlement, urban intervention, displacement, compensation

Abstract

In the Municipality of Medellín, a series of urban transformations aimed at the construction of a new city model that aims to be inclusive and equitable are being presented, the problem is that these actions are being implemented improperly, since, in the construction process of these public works is not taking into account the effects on the inhabitants, leaving as a consequence the violation of collective and individual rights.

In the Medellín Development Plan 2012-2015, the construction of a new metrocable line was planned in the northwestern sector of the city of Medellín, in charge of the Empresa de Transporte Masivo del Valle de Aburrá, mainly impacting the 12 de Octubre neighborhoods and La Paralela, located in commune 5. As a result of the project's implementation, a massive displacement of the inhabitants of the aforementioned sectors was generated, especially in La Paralela neighborhood.

The Legal Clinic of Public Interest -UNAULA- intervened in that case by advancing relevant Constitutional Actions such as Rights of petition and a Popular Action with request for precautionary measure, in order to achieve the least negative impact on the affected population, through fair compensation and prior, in addition to a resettlement according to law.

Although the claims were denied, this experience left a great apprenticeship that aims to be constantly retaken in future cases and, in addition, the objectives of social intervention stipulated in the statutes of the Legal Clinic were met.

Author Biography

Valeria Rincón Zapata, Universidad Autónoma Latinoamericana

Estudiante

References

Constitución Política de Colombia. 1991

Harvey, D. (2007). Breve historia del neoliberalismo. Madrid, España.

Ley 388 de 1997 o “Ley de Desarrollo territorial” literal.

Plan de Desarrollo 2012-2015 de la ciudad de Medellín.

Resolución N° 336 de 2015 “Por medio de la cual se declara situación de urgencia por motivos de utilidad pública e interés social, con el objeto de adelantar el proceso de adquisición de predios, que se destinarán para la construcción de la línea del Proyecto Cable el Picacho de la ciudad de Medellín”.

Published

2020-06-08

How to Cite

Rincón Zapata, V. (2020). El desplazamiento intraurbano por obras públicas en la ciudad de Medellín:: caso Metrocable del Picacho. Conocimiento Semilla, (5), 62–76. https://doi.org/10.24142/cose.n5a6

Issue

Section

Artículos